Aspects of „in situ†testing of piles with large diameter. Study case

Costel Plescan, Florin Varlam

Abstract


During the stage of development of a bridge, the quality has a great significance for the life cycle of the work itself. A work performed incorrectly, shortens proportionately the duration of service of construction -bridge, often, may have major implications for economic, social, etc..
This article presents the concept of evaluation of pilots test using tests "in situ" as we find in literature specialized in this field.
The case study presented in the second half, highlighted both the need and importance of achieving vertical strength test pilot for foundations.
The test confirms the correctness of the calculation assumptions provided by the project, by establishing precise bearing capacity real exerted by the pilot tried.


Full Text:

PDF

References


NP 045-2000 Normative

SR EN 1536:2004 Execuţia lucrărilor geotehnice speciale. Piloţi foraţi

STAS 2561/1-81 Fundaţii pe piloţi. Încercarea în teren a piloţilor de probă şi din fundaţii

STAS 2561/4-90 Piloţi foraţi de diametru mare. Prescripţii generale de proiectare, execuţie şi recepţie

REX pod

VEGA 93


Refbacks

  • There are currently no refbacks.


Copyright (c) 2016 INTERSECTII / INTERSECTIONS

Indexed

Google Scholar    Directory of Research Journals Indexing