Aspects of „in situ†testing of piles with large diameter. Study case
Abstract
During the stage of development of a bridge, the quality has a great significance for the life cycle of the work itself. A work performed incorrectly, shortens proportionately the duration of service of construction -bridge, often, may have major implications for economic, social, etc..
This article presents the concept of evaluation of pilots test using tests "in situ" as we find in literature specialized in this field.
The case study presented in the second half, highlighted both the need and importance of achieving vertical strength test pilot for foundations.
The test confirms the correctness of the calculation assumptions provided by the project, by establishing precise bearing capacity real exerted by the pilot tried.
Full Text:
PDFReferences
NP 045-2000 Normative
SR EN 1536:2004 Execuţia lucrărilor geotehnice speciale. Piloţi foraţi
STAS 2561/1-81 Fundaţii pe piloţi. Încercarea în teren a piloţilor de probă şi din fundaţii
STAS 2561/4-90 Piloţi foraţi de diametru mare. Prescripţii generale de proiectare, execuţie şi recepţie
REX pod
VEGA 93
Refbacks
- There are currently no refbacks.
Copyright (c) 2016 INTERSECTII / INTERSECTIONS
Indexed